Bridge Making

This is a competition in which each team is attempting to build the strongest bridge. Each team will construct a bridge using only 100 ice cream sticks, Fevicol, and a length of masking tape. Number of Participants: 2 people in each group.

Approximate Time: 1hour for the activity and 2 hrs. for judgment and result

the competition

1. The bridge must be constructed using an ice cream stick and Tape. The sticks can be interconnected directly or through the use of tape; however, no other form of fastening devices, such as pins, may be used. Sticks may be cut or slit, if desired.
2. The span (length) of the bridge will be measured before the loading process begins. To qualify, the span of the bridge must be at least 30 cm.
3. The bridge must have a smooth, continuous driving deck that spans the entire length of the bridge.
4. The load will be applied to the deck of the bridge by means of a rope or strap that will hold the weight below the bridge. The bridge model will be loaded till failure.

scoring

Scoring will be based on the Mass supported by the bridge in grams.